Go back to Case Studies main pageCase Study: Shore Building Contractors, Basingstoke

 

Shore Building Contractors Project

 

 

 

 

Shore Building

 

System size:
Estimated annual output:
Estimated annual CO2 savings:

Three new-build houses which needed Code for Sustainable Homes level 3 to pass building regulations. A SAP performance analysis indicated that a 840W PV system would achieve the requirements. The inverters were selected so additional capacity can be added later.

 

Go back to Case Studies main pageBack to Case Studies